Monday, September 3, 2012

Ready To Start Millwork

After assembling the structure to make sure everything was a good  fit, I broke it down into panels that will get sheathing installed on them. Now the fun starts! Everything will be handmade. The siding will be 3 1/2 inch wedge. The windows will be wooden, and operable. Everything will be oil primed first, acrylic primed, and then two topcoats of Sherwin Williams Emerald. We want this little house to be as durable as possible. Check back now and then to see our millwork progress.

No comments:

Post a Comment