Building Little Dreams
Thursday, November 20, 2014
WITH THE ROUGH FRAMING, ROOFING, AND INSPECTION OVER, IT'S TIME TO TRIM THIS PATIO COVER
'
Friday, November 14, 2014
THE TORCH DOWN ROOF IS INSTALLED AND READY FOR THE WOOD SHAKES TO BE LAPPED OVER THE VALLEYS
A FEW MORE CEILING JOIST AND THIS PATIO COVER WILL BE READY FOR THE PLYWOOD CEILING
Sunday, November 9, 2014
THE UPPER RAFTERS ARE ON AND THE SHEATHING IS GOING ON. ONE MORE DAY TO FINISH UP THE DETAILS FOR THE ROOFING.
Saturday, November 8, 2014
THE LOWER HALF OF THE RAFTERS ARE IN PLACE. THE UPPER HALF WILL ATTACH JUST BELOW THE SKYLIGHTS.
Friday, November 7, 2014
WE SURVIVED THE RAIN WITHOUT LEAKS. BOTH LAMINATED BEAMS ARE INSTALLED AND READY TO SUPPORT JOIST AND RAFTERS.
Monday, November 3, 2014
DON'T TAKE SHORTCUTS WHEN RAISING HEAVY BEAMS. THE PREVIOUS RIG SNAPPED AND EVERYTHING CAME CRASHING DOWN !
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)