Thursday, November 20, 2014

WITH THE ROUGH FRAMING, ROOFING, AND INSPECTION OVER, IT'S TIME TO TRIM THIS PATIO COVER

'

Posted by Unknown at 6:47 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Friday, November 14, 2014

THE TORCH DOWN ROOF IS INSTALLED AND READY FOR THE WOOD SHAKES TO BE LAPPED OVER THE VALLEYS


Posted by Unknown at 5:28 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

A FEW MORE CEILING JOIST AND THIS PATIO COVER WILL BE READY FOR THE PLYWOOD CEILING


Posted by Unknown at 5:24 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Sunday, November 9, 2014

THE UPPER RAFTERS ARE ON AND THE SHEATHING IS GOING ON. ONE MORE DAY TO FINISH UP THE DETAILS FOR THE ROOFING.



Posted by Unknown at 6:36 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Saturday, November 8, 2014

THE LOWER HALF OF THE RAFTERS ARE IN PLACE. THE UPPER HALF WILL ATTACH JUST BELOW THE SKYLIGHTS.




Posted by Unknown at 7:17 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Friday, November 7, 2014

WE SURVIVED THE RAIN WITHOUT LEAKS. BOTH LAMINATED BEAMS ARE INSTALLED AND READY TO SUPPORT JOIST AND RAFTERS.




Posted by Unknown at 7:14 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Monday, November 3, 2014

DON'T TAKE SHORTCUTS WHEN RAISING HEAVY BEAMS. THE PREVIOUS RIG SNAPPED AND EVERYTHING CAME CRASHING DOWN !


Posted by Unknown at 6:16 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

THIS 22 FOOT BEAM IS IN PLACE. WHEN THE RAIN IS OVER, IT WILL BE TURNED VERTICAL


Posted by Unknown at 6:11 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Saturday, November 1, 2014

THIS 500 POUND ELECTRIC HOIST PULLS THIS 250 POUND LAMINATED BEAM JUST FINE


Posted by Unknown at 6:33 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

THE ROOF OVERHANG IS REMOVED TO MAKE WAY FOR THE CEILING JOIST ON THE NEW COVER


Posted by Unknown at 6:26 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Designer & Builder contact me: bob817409@yahoo.com

Unknown
View my complete profile

Total Pageviews

Followers

Blog Archive

  • ►  2015 (88)
    • ►  October (11)
    • ►  September (72)
    • ►  June (1)
    • ►  May (4)
  • ▼  2014 (116)
    • ►  December (8)
    • ▼  November (10)
      • WITH THE ROUGH FRAMING, ROOFING, AND INSPECTION OV...
      • THE TORCH DOWN ROOF IS INSTALLED AND READY FOR THE...
      • A FEW MORE CEILING JOIST AND THIS PATIO COVER WILL...
      • THE UPPER RAFTERS ARE ON AND THE SHEATHING IS GOIN...
      • THE LOWER HALF OF THE RAFTERS ARE IN PLACE. THE UP...
      • WE SURVIVED THE RAIN WITHOUT LEAKS. BOTH LAMINATED...
      • DON'T TAKE SHORTCUTS WHEN RAISING HEAVY BEAMS. THE...
      • THIS 22 FOOT BEAM IS IN PLACE. WHEN THE RAIN IS OV...
      • THIS 500 POUND ELECTRIC HOIST PULLS THIS 250 POUND...
      • THE ROOF OVERHANG IS REMOVED TO MAKE WAY FOR THE C...
    • ►  October (7)
    • ►  August (6)
    • ►  June (11)
    • ►  May (4)
    • ►  April (22)
    • ►  March (4)
    • ►  February (43)
    • ►  January (1)
  • ►  2013 (862)
    • ►  December (119)
    • ►  November (96)
    • ►  October (85)
    • ►  September (39)
    • ►  August (81)
    • ►  July (112)
    • ►  June (126)
    • ►  May (78)
    • ►  April (79)
    • ►  March (37)
    • ►  February (7)
    • ►  January (3)
  • ►  2012 (48)
    • ►  December (12)
    • ►  November (23)
    • ►  October (1)
    • ►  September (6)
    • ►  August (4)
    • ►  July (2)
Awesome Inc. theme. Theme images by andynwt. Powered by Blogger.